<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:creator>Bürgy, Reinhard</dc:creator>
  <dc:date>2017</dc:date>
  <dc:description xmlns:ns0="xml" ns0:lang="en">Due to the limited applicability in practice of the classical job shop scheduling  problem, many researchers have addressed more complex versions of this problem  by including additional process features, such as time lags, setup times, and buffer  limitations, and have pursued objectives that are more practically relevant than the  makespan, such as total flow time and total weighted tardiness. However, most  proposed solution approaches are tailored to the specific scheduling problem studied  and are not applicable to more general settings. This article proposes a neighborhood  that can be applied for a large class of job shop scheduling problems with regular  objectives. Feasible neighbor solutions are generated by extracting a job from a given  solution and reinserting it into a neighbor position. This neighbor generation in a sense  extends the simple swapping of critical arcs, a mechanism that is widely used in the  classical job shop but that is not applicable in more complex job shop problems. The  neighborhood is embedded in a tabu search, and its performance is evaluated with an  extensive experimental study using three standard job shop scheduling problems: the  (classical) job shop, the job shop with sequence-dependent setup times, and the  blocking job shop, combined with the following five regular objectives: makespan, total  flow time, total squared flow time, total tardiness, and total weighted tardiness. The  obtained results support the validity of the approach.</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:identifier>https://folia.unifr.ch/unifr/documents/309282</dc:identifier>
  <dc:identifier>https://folia.unifr.ch/documents/309282/files/2017_Buergy_Neighborhood.pdf</dc:identifier>
  <dc:language>eng</dc:language>
  <dc:relation>info:eu-repo/semantics/altIdentifier/doi/10.1007/s10951-017-0532-2</dc:relation>
  <dc:rights>info:eu-repo/semantics/openAccess</dc:rights>
  <dc:rights>License undefined</dc:rights>
  <dc:source>Journal of Scheduling. - Springer. - 2017, vol. 20, p. 391-422</dc:source>
  <dc:subject xmlns:ns1="xml" ns1:lang="en">job shop scheduling</dc:subject>
  <dc:subject xmlns:ns2="xml" ns2:lang="en">general regular objective</dc:subject>
  <dc:subject xmlns:ns3="xml" ns3:lang="en">sequence-dependent setup times</dc:subject>
  <dc:subject xmlns:ns4="xml" ns4:lang="en">blocking job shop</dc:subject>
  <dc:subject xmlns:ns5="xml" ns5:lang="en">job insertion</dc:subject>
  <dc:subject xmlns:ns6="xml" ns6:lang="en">neighborhood</dc:subject>
  <dc:subject xmlns:ns7="xml" ns7:lang="en">tabu search</dc:subject>
  <dc:subject>info:eu-repo/classification/udc/004</dc:subject>
  <dc:title xmlns:ns8="xml" ns8:lang="en">A Neighborhood for Complex Job Shop Scheduling Problems with Regular Objectives</dc:title>
  <dc:type>http://purl.org/coar/resource_type/c_6501</dc:type>
</oai_dc:dc>
