<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:creator>Meuwly, François-Xavier</dc:creator>
  <dc:creator>Ries, Bernard</dc:creator>
  <dc:creator>Zufferey, Nicolas</dc:creator>
  <dc:date>2010</dc:date>
  <dc:description xmlns:ns0="xml" ns0:lang="en">Consider a project which consists in a set of operations to be performed, assuming  the processing time of each operation is at most one time period. In this project,  precedence and incompatibility constraints between operations have to be satisfied.  The goal is to assign a time period to each operation while minimizing the duration of  the whole project and while taking into account all the constraints. Based on the mixed  graph coloring model and on an efficient and quick tabu search algorithm for the usual  graph coloring problem, we propose a tabu search algorithm as well as a variable  neighborhood search heuristic for the considered scheduling problem. We formulate  an integer linear program (useful for the CPLEX solver) as well as a greedy procedure  for comparison considerations. Numerical results are reported on instances with up to  500 operations.</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:identifier>https://folia.unifr.ch/global/documents/308027</dc:identifier>
  <dc:identifier>https://folia.unifr.ch/documents/308027/files/mixed.pdf</dc:identifier>
  <dc:language>eng</dc:language>
  <dc:relation>https://journals.lib.unb.ca/index.php/AOR/article/view/14273</dc:relation>
  <dc:rights>info:eu-repo/semantics/openAccess</dc:rights>
  <dc:rights>License undefined</dc:rights>
  <dc:source>Algorithmic Operations Research. - 2010, vol. 5, p. 75-85</dc:source>
  <dc:subject xmlns:ns1="xml" ns1:lang="en">Project Scheduling</dc:subject>
  <dc:subject xmlns:ns2="xml" ns2:lang="en">Local Search</dc:subject>
  <dc:subject xmlns:ns3="xml" ns3:lang="en">Mixed Graph Coloring</dc:subject>
  <dc:subject>info:eu-repo/classification/udc/004</dc:subject>
  <dc:title xmlns:ns4="xml" ns4:lang="en">Solution Methods for a Scheduling Problem with Incompatibility and Precedence Constraints</dc:title>
  <dc:type>http://purl.org/coar/resource_type/c_6501</dc:type>
</oai_dc:dc>
